The minds behind ZSK, however, apparently saw differently, in a way that's either really far-sighted (if traffic to Kielce or Kraków-Łódź explodes, or the CMK does end up so congested that speeds have to be limited, which is still hard to imagine) or a dumb waste of money and people's time… namely, a mixed-use sorta HSL line ("HSL standard" is thrown around a fair bit in ZSK to indicate lines that should be HSLs… but don't all look like they'd actually end up dedicated HSLs) branching out in Opoczno, following the existing line until Końskie (a political shrine by now), then a shorter route to Kielce, then along the existing line to Busko-Zdrój (that area is bound to see attention disproportionate to its population density, which is of course why hardly anyone can agree in all but the broadest of strokes how exactly it should be handled), then to around Kazimierza Wielka (formerly home to a system of windy narrow-gauge lines) where it would meet a sort-of hump line connecting it to both Kraków and Tarnów. This would be supposed to take some ICs off the old line between the two… Though it seems unclear how this would be handled around Kraków Główny, also in combination with the last part of this idea - a Kraków-Katowice HSL apparently routed alongside the A4 motorway.
Tunneling east-west under the whole city doesn't seem workable to me, but perhaps something more limited would happen? Or maybe the trains would take the Nowa Huta ring south to Podłęże and enter the city from that way?
In any case, the ZSK project spends quite a few words touting the benefits of a Katowice-Kraków-Kielce-Łódź/Warsaw arc, which would perhaps sound more convincing if they weren't also planning a big new trunk between Katowice and Łódź, too.
Then again, I wonder, maybe this is what it take to cope with a world where the train is the majority mode of transport. It's a slippery vision.
18/
#ZSKPolska #kolej #rail
Replies (1)
-
Looking further up that arc there's one of the more ambitious projects I have fewer reservations about, a new north-south trunk through the middle of Łódź Voivodeship, from Radomsko via Bełchatów and Łódź to Kutno (and onwards over the existing line to Płock to connect with the new HSL to the Tricity and the new transversal northeastwards). That's intended to be possibly even 250 in parts and seems like a reasonable conclusion after we've given up on doubling all of the existing Łódź-Kutno line in favor of point improvements (the northern half is also in the shadow plan, in addition to a line connecting the southern suburbs of Łódź with Piotrków, following the road network more closely). Combined with a much-needed Wieluń-Chorzew-Bełchatów-Piotrków corridor (I'd treat Piotrków-Tomaszów as more of stretch goal), this should play a good role in turning Bełchatów from a lignite town into a good commuter town (and God, I had not realized that power plant was only opened in 1982).
In addition, both projects want to straighten some things out with Opoczno-Przysucha and Kielce - Skarżysko-Kamienna shortcuts, though ZSK probably assigns higher parameters to both of these, I wonder what differences they're seeing there
19/
#ZSKPolska #kolej #rail #Łódzkie