Elektrine lite

← Feed

@js@ap.nil.im

2026-02-26 09:27 UTC

@skry@mastodon.social @blogdiva@mastodon.social Building a new fab is a very long process (and Apple doesn’t have any, they just use TSMC). TSMC has been pushed hard to build more fabs, but they said no. Why? Because they anticipate that if they build a fab now, by the time they open it, the AI bubble has burst and there is not enough demand to utilize it and then TSMC would be sitting on the costs. There were some articles about how TSMC is sabotaging the “AI future”, how only TSMC is to blame for not providing more capacity, etc. trying to pressure TSMC into building more fabs. But from their perspective, it makes no sense. They need to plan long term - think 10 years and more.

Replies (0)

No replies.