For Subcarpathia, aside from the aforementioned HSL for Stalowa Wola and Rzeszów, there's the idea of using a line that supplies a power plant in Połaniec on the Vistula as the base of a new Kielce-Rzeszów corridor connecting Mielec and Kolbuszowa. The shadow plan opts for just Połaniec-Mielec and a curve bypassing Dębica for the Rzeszów connection, which seems like a more economical option unless traffic on the Kraków-Rzeszów-Przemyśl trunk gets really bad - and even then the gov plan envisions upgrading it to 250, which ought to put quadruple-tracking into consideration, I think? In the south, the proposals are a curve allowing trains from Rzeszów to turn towards Krosno without having to trek several kilometers west to Jasło and back, and a Wisłoka valley line between Dębica and Jasło (which they apparently see some interregional traffic on), as oppsed to the shadow project's Rzeszów-Krosno and Rzeszów-Sanok tunnel-fests. Both plans recommend cutting the detour between Stalowa Wola and Sandomierz/Metan that exists probably solely because that's where the Austria-Russia border was back when that system was being built. 16/ #Podkarpackie #ZSKPolska #kolej #rail

Replies (1)

  • @HaTetsu@mastodon.com.pl 2026-06-17 21:04

    And now, we get to another eyebrow-raiser - ZSK's surprising new answer to the Kraków-Silesia question. The CMK, Poland's original HSL-to-be, serves Warsaw's connections to both the Upper Silesia-Zagłębie conurbation and Kraków. However, having been originally designed with more freight use in mind, it has a nice chord finish towards the former… while the more numerous Kraków-bound trains have to deal with a non-collision-free, single-track exit (which is to be rectified soon) and the increasingly bottlenecked Kraków-Kozłów section of the old Warsaw-Kielce-Kraków line. The Wild solution to this conundrum was to extend the CMK to a new junction around Bukowno near Olkusz, which seems to have grown over time into a station and gained the name Lesser Poland-Silesia Junction (also known by the abbreviation WMŚ), presumably from its border location. Anyway, from there, feeding trains into Katowice is still easy (though results in Sosnowiec and Dąbrowa Górnicza being stripped of a large number of long-distance connections), a new line is built towards Kraków via Olkusz and another one south to Oświęcim. It's not a bad idea and was pretty broadly accepted, not least because it also solves the long-standing problem of Olkusz having a significantly worse connection to its voivodeship capital than by road, even if it involves some hill-, forest-, mine- and desert-dodging 17/ #ZSKPolska #kolej #rail

    Open ##4994870